What Boards and Property Managers Require Before a Condo or Co-op Remodel
Before a condo or co-op kitchen or bath remodel can start, most buildings want board or management approval in writing, a signed alteration form, the contractor's paperwork, a schedule that fits the building's work hours, deliveries and debris planned around the elevator schedule, and a time with building staff to shut off water. Permits as required. Always get your building's own renovation rules in writing first.
Licensed & insured · PA HIC PA118319 · Greater Northeast Philly · Lower Bucks · nearby Montgomery County · (267) 463-8138
Your kitchen or bath shares walls, pipes, halls, and an elevator with your neighbors, so the building gets a say. We remodel kitchens and baths in occupied condos, apartments, and co-ops. Here's what buildings usually ask for.
Typical condo and co-op renovation rules (and board approval)
Most condo associations and co-op boards want written approval before a kitchen or bath remodel starts, plus insurance naming the building, weekday work hours, clean halls, scheduled water shut-offs, and deliveries planned around the elevator.
Typical rules often include:
- Board or management approval before work starts — a signed alteration agreement (or the building's renovation application / unit-change form). Work does not start without that written OK.
- Certificate of insurance — once the property agrees to work with the contractor, a COI naming the association or management, as the building requires.
- Weekday work hours — buildings often set weekday daytime hours and limit or bar weekend work. We plan loud work to fit the building's hours.
- Service entrance, debris, and hallway cleanliness — contractors usually use the service entrance or loading path the building names; construction debris is hauled out (not building trash rooms or chutes); halls and the elevator path stay protected. Ed cleans the hallway daily.
- Water shut-offs scheduled with the building — shut-offs coordinated with the super or maintenance staff ahead of time, because risers can affect neighbors.
- Elevator — plan deliveries and debris around the building's elevator schedule.
- Permits as required.
Every building's packet is a little different. Get the written rules from management, then send them to your contractor before the plan is final. Property managers can also see our preferred contractor for property managers page.
The building's sign-off form (the "alteration agreement")
An alteration agreement is the building's written permission for your project: you describe the work, the building reviews it, and you agree to follow its rules while the job is going on.
Start by getting the renovation rules in writing from management or the board, and send them to your contractor before the plan is final.
The form often asks for:
- A written scope, meaning a plain description of the work
- Drawings or a layout, especially if plumbing or walls move
- Your contractor's name, license, and insurance papers
- A planned start date and work schedule
Some buildings won't allow moving a kitchen or bath to a new spot, touching walls that hold the building up, or putting a wet room (a kitchen or bath) over a neighbor's dry room (like a bedroom), or they send those plans for extra review. Ask management how far ahead they need your paperwork.
Contractor license and certificate of insurance (COI)
Most buildings want your contractor's license and certificate of insurance before work starts. A COI is a one-page form from the contractor's insurance company. It shows the contractor has active insurance, such as general liability, and when it runs out.
Once a property agrees to work with us, Ed provides a certificate of insurance naming the association or management, as the building requires. Get the exact names from management so the certificate is right the first time.
We're licensed and insured in Pennsylvania, PA HIC PA118319.
Work hours, elevators, and hallways
Most buildings set work hours, want us to plan around the building's elevator schedule, and expect the halls protected and debris hauled out.
- Work hours are often weekdays, with limited weekend hours or none. Some buildings hold demo, tile removal, and cutting to certain hours. We plan the loud work to fit.
- Plan deliveries and debris around the building's elevator schedule. Elevator pads and floor runners in halls and lobbies are often required on work days.
- Ask management where trucks can park and unload.
- Construction debris usually can't go in the building's trash rooms or chutes. It gets hauled out.
Water shutoffs and risers
Water shutoffs are usually scheduled with the super or maintenance staff, because one valve can feed more than your unit.
A riser is a main pipe that feeds several stacked units. In many buildings, kitchen and bath shutoffs happen at the riser, so turning off your water can turn off your neighbors' water too. Neighbors on the same line may need notice.
Your building may also ask for working shutoff valves inside the unit after the remodel.
We agree on the shutoff time with staff ahead of time, keep it as short as we can, and make sure the water is back on with no leaks before we leave.
Permits: when they're needed
Whether you need a permit depends on the work and the address. Replacing cabinets and counters is different from moving plumbing or adding circuits.
Permits as required for the scope. We'll tell you what we think applies after an on-site look. The building may ask to see permits before work starts.
How we handle building requirements in occupied units
Most of our jobs are in homes where people are still living.
We walk the unit first
Ed McCluskey, our main contact, walks the unit before any final price or schedule.
From Ed: "I check the obvious first. The building rules, the work hours and days, and the elevator hours and rules. Then I plan parking and trash removal, including whether I can get a dumpster dropped off."
See all five occupied-unit packages: hall bath gut $15,000–$30,000; primary bath $25,000–$55,000; kitchen $35,000–$70,000; rental kitchen $25,000–$45,000; basement $25,000–$65,000 — materials included. Ranges finalize after we walk the unit.
How we run the job
- Once the property agrees to work with us, we provide a certificate of insurance naming the association or management, as the building requires, plus our license information.
- We give you a written scope and schedule to attach to the sign-off form. The form stays yours to sign.
- We plan deliveries and debris around the building's elevator schedule, and set shutoff dates with the property manager or super.
- We seal off the work area, protect the paths through the unit, and leave the hall and elevator path clean every day. Ed cleans the hallway daily. Regular progress updates by text, phone or email.
Buildings we've worked in
Residences at Dockside (bathrooms), Siena Place, 511 Condominium Residences, William Penn House (a co-op), and Bridgeview Place Condominiums.
Quick checklist before your remodel starts
- Get the building's renovation rules in writing
- Fill out the building's sign-off form (alteration agreement)
- Once the property agrees to work with the contractor, get a COI naming the association or management, as the building requires
- Confirm work hours and quiet-hour rules
- Plan deliveries and debris around the building's elevator schedule and confirm protection rules
- Plan debris removal (no building trash rooms or chutes)
- Schedule water shutoffs with building staff
- Check if permits apply (permits as required)
- Give neighbors on your floor, and above and below, a short notice with dates, hours, and a contact (we can draft one)
- Ask whether the building requires a refundable deposit and how it works
- Walk the unit with your contractor and get a clear schedule
FAQs
What is a condo alteration agreement?
It's your building's written permission for a remodel. You describe the work, share your contractor's details and schedule, and agree to follow the building's rules. Co-ops use something similar. Names vary, so ask management for your building's version.
What is a COI, and why does my building want its name on it?
A COI (certificate of insurance) is a one-page form showing your contractor has active coverage. Once a property agrees to work with us, we provide a certificate of insurance naming the association or management, as the building requires. Get the exact names from management so it's right the first time.
Do I need a permit to remodel a condo kitchen or bathroom?
It depends on the work and the address. Permits as required for the scope. We'll tell you what we think applies after we look at the unit. The building may ask to see permits before work starts.
Can I live in my condo during a kitchen or bathroom remodel?
Usually, yes. Most of our condo, apartment, and co-op jobs are in homes where people are still living. We seal off the work area, clean up every day, and give you a clear schedule and daily work hours before we start.
How is the water shut off for a bathroom remodel in a condo or co-op?
In many buildings, kitchen and bath pipes run on shared lines called risers, so shutting off your water can affect neighbors. Shutoffs are usually scheduled with the super ahead of time. We check for leaks before we leave.
Is approval different for a co-op than a condo?
A bit. In a condo you own your unit, and the association's rules cover the building. In a co-op you own shares and lease your apartment, so the co-op board usually approves the work. Both commonly ask for the same paperwork.
What are typical condo and co-op renovation rules?
Most buildings want written board or management approval before work starts, a certificate of insurance naming the association or management as the building requires, weekday work hours, clean halls with debris hauled out, water shut-offs scheduled with staff, and deliveries planned around the elevator schedule. Permits as required. Always get your building's own rules in writing.
Planning a kitchen or bath in your condo or co-op? Call or text (267) 463-8138. We'll walk the unit first, look at your building's rules, and give you a clear plan and schedule before any work starts.